demolition

Attached Deck Removal in Boise: What About the Siding?

Pulling a deck off your house exposes the wall behind it. Here's what Boise homeowners find under the ledger board, what it costs, and how to close it up.

Exposed house wall and bolt holes after attached deck removal at a home in Garden City, Idaho, with old deck boards stacked nearby

A homeowner in Garden City walked us around back last spring to look at a 14x16 deck that had gone spongy. Nice yard, bad deck. But the thing she kept asking about wasn't the decking, it was the wall behind it, which is exactly the right question to ask before any attached deck removal.

"When you pull that off, what's under there?"

Honest answer: nobody knows until it's off. The deck is the easy part. What's behind the ledger board is where these jobs get interesting, and it's the piece most people don't think about until the crew is already swinging.

Why the wall matters more than the deck

A deck attached to your house is bolted to a long horizontal board called the ledger. That ledger is lagged through your siding and into the rim joist of the house itself.

So for the last 20 or 30 years, there's been a seam sitting right where water likes to run.

If whoever built it flashed that seam correctly, you'll pull the deck off and find dry, boring sheathing. That's the good outcome, and it's pretty common on newer builds around Meridian and northwest Boise.

If they skipped the flashing, and on plenty of 1970s and 80s homes on the Boise Bench they did, you're going to find dark, soft OSB or plywood. Sometimes it's a spot the size of a dinner plate. Sometimes you can push a screwdriver straight through a four-foot section.

Neither one is a disaster. But one costs a lot more to close up than the other, and you'd rather know that before the deck is sitting in a pile in the yard.

Heads up: If you're planning to sell, pull the deck before you list, not after an inspector flags it. Rot found in July gives you time to fix it for a few hundred bucks. The same rot found during a 10-day inspection window turns into a price concession, and those are never small.

What attached deck removal actually involves

Here's the order it usually goes, whether we're doing it or you're spending a Saturday on it yourself.

Railings first. Then decking boards, then joists, then beams and posts. The ledger comes off last, because until that point it's still carrying a surprising amount of weight.

Once the ledger is unbolted and pulled, you've got a raw stripe across the back of your house. Usually 10 to 20 feet long, 8 to 12 inches tall, with a row of bolt holes running into your framing.

That stripe has to get closed up. Not eventually. Before the next real rain. Which means:

  • Bolt holes sealed with exterior-grade sealant, not left open
  • Soft or blackened sheathing cut out and replaced with new material
  • House wrap patched and lapped so water sheds down and out instead of behind it
  • Siding pieced in to match, or the whole run replaced if the match is hopeless
  • Paint or stain on anything raw, because Idaho sun chews up bare wood fast

We handle the demo, the haul-off, and getting that wall sealed and weather-tight. Matching 30-year-old cedar lap siding is a siding contractor's job, and we'll say so instead of pretending otherwise. Our deck removal service is about getting the structure gone and the wall protected, not repainting your house.

What attached deck removal costs when siding is involved

Rough Treasure Valley numbers, based on what we actually quote:

Part of the jobTypical range
Deck removal and haul-off (10x12 to 16x20)$700 – $2,400
Sealing bolt holes, wrap patch, weather-tightusually included
Replacing rotted sheathing$150 – $600
Siding match and install (separate contractor)$300 – $1,200

The spread on siding is wide for a reason. Vinyl and fiber cement are usually easy to source. Older stained cedar or T1-11 is a coin flip: sometimes you find a close match at a Boise lumberyard, sometimes you end up redoing the whole wall section so it doesn't look patched.

Second-story decks run higher too. More height, more staging, and the debris has to come down instead of getting dragged straight to the truck.

Where all that material ends up

Most deck framing is pressure-treated, and treated lumber has rules. You can't burn it, and it doesn't go into wood recycling.

It goes to the Ada County Landfill out on Seaman's Gulch, or Pickles Butte if the job's down in Nampa or Caldwell. Metal railings, brackets, and joist hangers get pulled off and run over to Western Recycling. Composite decking is landfill material too. Nobody in the valley takes it back.

If there's anything worth saving, like a solid gate or dry lumber from under a covered section, we'll set it aside. Idaho Youth Ranch won't take construction material, but neighbors and Facebook groups will take clean 2x6s all day.

Should you just repair it instead?

Sometimes, yeah. If the ledger is solid and only the walking surface is shot, you're looking at a resurface, and that's a very different budget. We broke that call down in Deck Demolition vs. Repair.

Wondering whether the city needs to be involved? Depends on size, height, and whether you're rebuilding. Details are in Deck Removal Permits in Boise.

What's not worth doing is leaving a failing attached deck up because you're nervous about what's behind it. If water's getting in, it's already getting in. The deck is just hiding it.

Bottom line

With an attached deck, you're not only removing a deck. You're opening a wall. Plan for it, set aside a few hundred extra for sheathing and siding, and get everything buttoned up the same week the deck comes down.

Want a real number instead of a guess? Send over a couple photos of the deck and where it meets the house, or call us at (208) 593-2877. We do deck removal all over the Treasure Valley and we'd love the job, but we'll also tell you if the honest answer is that you don't need us yet.

deck removaldemolitionboisehome exterior

Need Help With Deck Removal?

Top Shelf serves Boise and the Treasure Valley with professional junk removal, cleanouts, and demolition services.

Add photos (optional - helps with accurate quotes)

0/10 photos added